{"id":6445,"date":"2023-10-08T17:00:00","date_gmt":"2023-10-08T10:00:00","guid":{"rendered":"http:\/\/vla.com.vn\/hop-long-bridge-my-thuan-2-in-mid-october\/"},"modified":"2023-12-27T15:47:28","modified_gmt":"2023-12-27T08:47:28","slug":"hop-long-bridge-my-thuan-2-in-mid-october","status":"publish","type":"post","link":"https:\/\/vla.com.vn\/en\/hop-long-bridge-my-thuan-2-in-mid-october\/","title":{"rendered":"Hop Long Bridge My Thuan 2 in mid-October"},"content":{"rendered":"<h3 class=\"text detail-sapo\" data-type=\"sapo\" data-role=\"sapo\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\">My Thuan 2 Bridge is in the sprint construction phase, the investor and contractor are urgently completing the remaining items. Mid-October will meet the bridge, completing the project by the end of 2023.<\/span><\/h3>\n<figure class=\"VCSortableInPreviewMode\">\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\"><a class=\"detail-img-lightbox\" title=\"On October 6, Mr. Trinh Truong Hai, Executive Director of My Thuan 2 Bridge Project (Project Management Board 7), said that in mid-October, My Thuan 2 Bridge will be completed. The project has a total length of more than 6 km. km, of which the main bridge is about 1.9 km long, designed with 6 lanes, speed of 80 km\/h.\" href=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z475589918767954f8cc49b041fb8632b0d55e199d03ba-1696579516260991179973.jpg\" target=\"_blank\" data-fancybox=\"img-lightbox\" rel=\"noopener\"><img decoding=\"async\" id=\"img_634662076083478528\" class=\"lightbox-content\" title=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 1.\" src=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z475589918767954f8cc49b041fb8632b0d55e199d03ba-1696579516260991179973.jpg\" alt=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 1.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z475589918767954f8cc49b041fb8632b0d55e199d03ba-1696579516260991179973.jpg\"><\/a><\/span><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"\" spellcheck=\"true\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\">On October 6, Mr. Trinh Truong Hai, Executive Director of the My Thuan 2 bridge project (Project Management Board 7), said that the My Thuan 2 bridge will be completed in mid-October. The project has a total length of more than 6 km, of which the main bridge is about 1.9 km long, designed with 6 lanes, speed of 80 km\/h.<\/span><\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\"><a class=\"detail-img-lightbox\" title=\"The project started construction in February 2020, with a total investment capital of about 5,000 billion VND. According to Project Management Board 7, up to now, the project has reached more than 93% of the contract value.\" href=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z475875051651713c70dec42f0ff17841ee2d070deb1ab-16965793699551947472365.jpg\" target=\"_blank\" data-fancybox=\"img-lightbox\" rel=\"noopener\"><img decoding=\"async\" id=\"img_634661471646523392\" class=\"lightbox-content\" title=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 2.\" src=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z475875051651713c70dec42f0ff17841ee2d070deb1ab-16965793699551947472365.jpg\" alt=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 2.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z475875051651713c70dec42f0ff17841ee2d070deb1ab-16965793699551947472365.jpg\"><\/a><\/span><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\">The project started construction in February 2020, with a total investment capital of about 5,000 billion VND. According to Project Management Board 7, up to now, the project has reached more than 93% of the contract value.<\/span><\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\"><a class=\"detail-img-lightbox\" title=\"Of the five construction and installation packages, up to now, four have been basically completed. As for the main package of construction of the pier body from T14-T17, the structure on the main span of the cable-stayed span... is currently more than 85% completed.\" href=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z47587451717356d17d7019d55353896f2e8abb4bc9674-16965793699491984013750.jpg\" target=\"_blank\" data-fancybox=\"img-lightbox\" rel=\"noopener\"><img decoding=\"async\" id=\"img_634661470116139008\" class=\"lightbox-content\" title=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 3.\" src=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z47587451717356d17d7019d55353896f2e8abb4bc9674-16965793699491984013750.jpg\" alt=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 3.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z47587451717356d17d7019d55353896f2e8abb4bc9674-16965793699491984013750.jpg\"><\/a><\/span><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"\" spellcheck=\"true\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\">Of the five construction and installation packages, up to now, four have been basically completed. As for the main package of construction of the pier body from T14-T17, the structure on the main span of the cable-stayed span&#8230; is currently more than 85% completed.<\/span><\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\"><a class=\"detail-img-lightbox\" title=\"With urgent progress, the contractor deployed three construction phases with dozens of workers fiercely constructing the remaining items.\" href=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z4758745136067a1ca6331b1e65e1dc9b9201eefae835d-1696579369850964185553.jpg\" target=\"_blank\" data-fancybox=\"img-lightbox\" rel=\"noopener\"><img decoding=\"async\" id=\"img_634661466646065152\" class=\"lightbox-content\" title=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 4.\" src=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z4758745136067a1ca6331b1e65e1dc9b9201eefae835d-1696579369850964185553.jpg\" alt=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 4.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z4758745136067a1ca6331b1e65e1dc9b9201eefae835d-1696579369850964185553.jpg\"><\/a><\/span><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\">With urgent progress, the contractor deployed three construction phases with dozens of workers fiercely constructing the remaining items.<\/span><\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\"><a class=\"detail-img-lightbox\" title=\"Steel mold processing worker.\" href=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z4758750569131148eb634655fde273e6f487b8971dd7e-1696579370201197612479.jpg\" target=\"_blank\" data-fancybox=\"img-lightbox\" rel=\"noopener\"><img decoding=\"async\" id=\"img_634661472936144896\" class=\"lightbox-content\" title=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 5.\" src=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z4758750569131148eb634655fde273e6f487b8971dd7e-1696579370201197612479.jpg\" alt=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 5.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z4758750569131148eb634655fde273e6f487b8971dd7e-1696579370201197612479.jpg\"><\/a><\/span><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\">Steel mold processing worker.<\/span><\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\"><a class=\"detail-img-lightbox\" title=\"According to the design, the road leading to both ends of the bridge is more than 4 km long in Tien Giang and Vinh Long provinces. In the photo, workers are completing the final stages of completing the My Thuan 2 bridge.\" href=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z47587603302883cf04392e06feed2f8961d03fc1f6161-16965793702105098207.jpg\" target=\"_blank\" data-fancybox=\"img-lightbox\" rel=\"noopener\"><img decoding=\"async\" id=\"img_634661471096823808\" class=\"lightbox-content\" title=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 6.\" src=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z47587603302883cf04392e06feed2f8961d03fc1f6161-16965793702105098207.jpg\" alt=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 6.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z47587603302883cf04392e06feed2f8961d03fc1f6161-16965793702105098207.jpg\"><\/a><\/span><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\">According to the design, the road leading to both ends of the bridge is more than 4 km long in Tien Giang and Vinh Long provinces. In the photo, workers are completing the final stages of completing the My Thuan 2 bridge.<\/span><\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\"><a class=\"detail-img-lightbox\" title=\"Workers and engineers review technical elements on the tower.\" href=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z4758760351202dbf22874181ba4be721314afcd97bd13-1696579370346729770221.jpg\" target=\"_blank\" data-fancybox=\"img-lightbox\" rel=\"noopener\"><img decoding=\"async\" id=\"img_634661470941114368\" class=\"lightbox-content\" title=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 7.\" src=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z4758760351202dbf22874181ba4be721314afcd97bd13-1696579370346729770221.jpg\" alt=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 7.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z4758760351202dbf22874181ba4be721314afcd97bd13-1696579370346729770221.jpg\"><\/a><\/span><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\">Workers and engineers review technical elements on the tower.<\/span><\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\"><a class=\"detail-img-lightbox\" current project progress is meeting the proposed plan. Workers are preparing stages to complete expected in mid-October. For some other items such as embankments reinforce river Construction href=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z4758750628163b26087fbd68177b23c62f21277a43e6c-16965793701912094016280.jpg\" target=\"_blank\" data-fancybox=\"img-lightbox\" rel=\"noopener\"><img decoding=\"async\" id=\"img_634661472862715904\" class=\"lightbox-content\" title=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 8.\" src=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z4758750628163b26087fbd68177b23c62f21277a43e6c-16965793701912094016280.jpg\" alt=\"Hop Long Bridge My Thuan 2 in mid-October - Photo 8.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/baogiaothong.mediacdn.vn\/603483875699699712\/2023\/10\/6\/z4758750628163b26087fbd68177b23c62f21277a43e6c-16965793701912094016280.jpg\"><\/a><\/span><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\">&#8220;The current project progress is meeting the proposed plan. Workers are preparing the stages to complete the bridge, expected in mid-October. For some other items such as embankments to reinforce the current river bank, Construction is 50% completed,&#8221; Mr. Trinh Truong Hai added.<\/span><\/p>\n<p class=\"\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 12pt;\">Source: bao Giaothong.vn<\/span><\/p>\n<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>My Thuan 2 Bridge is in the sprint construction phase, the investor and contractor are urgently completing the remaining items. Mid-October will meet the bridge, completing the project by the end of\u2026<\/p>\n","protected":false},"author":1572,"featured_media":7315,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":["post-6445","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/vla.com.vn\/en\/wp-json\/wp\/v2\/posts\/6445","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vla.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vla.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vla.com.vn\/en\/wp-json\/wp\/v2\/users\/1572"}],"replies":[{"embeddable":true,"href":"https:\/\/vla.com.vn\/en\/wp-json\/wp\/v2\/comments?post=6445"}],"version-history":[{"count":1,"href":"https:\/\/vla.com.vn\/en\/wp-json\/wp\/v2\/posts\/6445\/revisions"}],"predecessor-version":[{"id":7335,"href":"https:\/\/vla.com.vn\/en\/wp-json\/wp\/v2\/posts\/6445\/revisions\/7335"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vla.com.vn\/en\/wp-json\/wp\/v2\/media\/7315"}],"wp:attachment":[{"href":"https:\/\/vla.com.vn\/en\/wp-json\/wp\/v2\/media?parent=6445"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vla.com.vn\/en\/wp-json\/wp\/v2\/categories?post=6445"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vla.com.vn\/en\/wp-json\/wp\/v2\/tags?post=6445"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}